Upgrade Power to Mango Packing Sheds
Category: Electrical
Client
NT Land Development
Problem to Solve
Insufficient power to enable upgrade of packing shed refrigeration and packing plant.
Our Approach to the Solution
Worked with the client to assess future needs and liaised with the local power authority in selecting a cost-effective future-proof solution.
Project Results
Installation of a new 1MVA PWC transformer with associated CT Meter Panel and Main Distribution Board, which will cover their power needs for now and the foreseeable future.